Full Home Remodel in North Austin
A full home remodel is the fastest way to make an older or “almost right” home feel intentional again—without treating your house like an endless list of weekend fixes.
If you’re updating more than one space, the advantage is coordination: one plan, one sequence, and one set of decisions that align across the whole home.
If you’re updating more than one space, the advantage is coordination: one plan, one sequence, and one set of decisions that align across the whole home.
Who This Is For
A whole-home plan is a good fit if you recognize any of these:
- Your kitchen and at least one bathroom need updates
- Floors feel worn, uneven, dated, or hard to keep clean
- Finishes don’t match from room to room
- You want to fix daily friction—storage, flow, lighting, maintenance—without doing five separate projects
- You’re tired of unclear communication and changing stories from contractors
Not a fit? If you need a full home remodel completed “in a few weeks,” it’s usually better to reduce scope and phase the work.
Ways To Connect With Renno Pro
What a Full Home Remodel Can Include
Every house is different. In North Austin, whole-home projects commonly include a mix of:
- Kitchen remodeling
- Bathroom renovations
- Flooring installation (hardwood, laminate, tile)
- Tile work and custom showers
- Paint, trim, lighting, and finish upgrades
- Targeted plumbing updates tied to the remodel
What we avoid is “scope drift”—where the remodel expands without a plan and the budget follows it.
Typical Timelines (Directional Ranges)
Every home is different, but here are realistic starting ranges we see for common scopes. These ranges assume normal availability and no major structural surprises.
- Kitchen-only remodel: typically 3–6 weeks
- One bathroom remodel: typically 2–4 weeks
- Kitchen + 2 bathrooms: typically 6–10 weeks
- Kitchen + 2 bathrooms + flooring across most of the home: typically 8–12+ weeks
- Full home remodel with multiple rooms + custom tile + plumbing moves: typically 10–16+ weeks
We’ll confirm a range after we understand your scope and finish level, and we’ll keep you updated as decisions and site conditions become clear.
Typical Cost Ranges (Directional Examples)
Costs vary based on scope, selections, and complexity. If you’re trying to set expectations early, these directional ranges can help.
- Focused remodel (kitchen or 1–2 baths, limited layout changes): often starts in the $25K–$80K+ range
- Mid-scope whole-home refresh (multiple rooms, flooring, paint/trim, selective tile): often falls in the $75K–$200K+ range
- Large whole-home remodel (multiple wet areas, custom tile/showers, plumbing moves, higher-end finishes): can be $200K+
These are not quotes—just practical guardrails. The fastest way to get a baseline range for your home is the online estimate, then we refine from there.
Quality Assurance (The “287‑Point QA Checklist”)
Most homeowners don’t want a contractor who talks fast. They want a contractor who checks details.
Renno Pro uses a 287‑Point Quality Assurance Checklist to keep the work organized from protection and prep through final walkthrough. It’s not there to create paperwork—it’s there to reduce missed steps.
Examples of what gets checked:
Renno Pro uses a 287‑Point Quality Assurance Checklist to keep the work organized from protection and prep through final walkthrough. It’s not there to create paperwork—it’s there to reduce missed steps.
Examples of what gets checked:
- Surface and floor protection before work starts
- Clean transitions where flooring meets tile and trim
- Straight, consistent grout lines and clean caulk joints
- Door clearance and smooth operation after flooring changes
- Final punch list items documented and closed out
Frequently Asked Questions
A mid-scope whole-home refresh often falls in the $75K–$200K+ range, depending on how many rooms are in scope and your finish level. Larger projects with multiple wet areas, custom tile, and plumbing moves can exceed $200K+. The fastest way to get a baseline for your home is the online estimate.
A kitchen + 2 bathrooms often runs 6–10 weeks, and adding flooring across most of the home commonly pushes the range to 8–12+ weeks. Larger whole-home scopes can run 10–16+ weeks. We’ll confirm a range once we understand scope and selections.
Often, yes—especially for structural changes and most plumbing or electrical modifications. Requirements vary by jurisdiction. We plan for permit and inspection steps early so the project doesn’t stall.
Sometimes. It depends on what areas are being remodeled and how we can stage the work. We’ll talk through disruption, access, and safety before the build starts.
We reduce surprises by confirming scope early, aligning finish level, and keeping communication clear as decisions are made. The online estimate is a baseline—then we refine with real details.
Yes. If you want paid guidance to research options, clarify scope, or plan the project, see our consulting page.